Zum Inhalt springen
English, Sprache wählen
The hairpin bends of a mountain pass road through autumn larch woods, with peaks behindAll projectsNew construction

Bolzano South depot

A new hall brings vehicle maintenance and cleaning together on one site.

News

You might also be interested in

  • Cyclists push their bicycles along the platform past a Vinschgau Railway train

    Electrification of the Vinschgau Railway

    Overhead lines, new signalling and adapted stations are preparing the Vinschgau Railway for capable electric operation.

    Read more
  • Cyclists push their bicycles along the platform past a Vinschgau Railway train

    Riggertal Loop links the Puster Valley and Brenner axis

    The new rail link near Schabs enables direct services and shortens journeys between the Puster Valley, Brixen and Bolzano.

    Read more